| WP1
INTELLSERVE
|
Analysis
of User Requirements.
Collection of user requirements and assessment of currently
existing technology and infrastructure, resulting in the User Requirement
Specifications report (URS). |
| WP2
IMPETUS
|
Functional
Specifications.
Production of the detailed architecture of the demonstrator,
as well as the Functional Design Specification report (FDS). |
|
| WP3
NR
|
System Implementation.
This WP deals with the demonstrator integration and the
development and adaptation of required interfaces. |
| WP4
NR |
System Verification.
Verification tasks required prior to the demonstrator
phase. |
| WP5
INDI |
Demonstration.
Running the system in a real life environment in two
distinct sites. |
| WP6
ISDEFE |
Evaluation
and Assessment.
Evaluation and assessment of the project, divided into
two activities: The development of the evaluation guidelines and the actual
evaluation and assessment effort. |
| WP01
NR |
Project
Management.
All the managerial, administrative and technical steering
functions required for the proper execution of the contract. |
| WP02
NR |
Dissemination. |
| WP03
INDI |
Exploitation. |